2. The second revision
| 1994 version |
2000 version |
| Item No. |
Content |
Item No. |
Transfer to |
| 4.2.2Quality system procedures |
g the range and detail of the procedures--- g |
4.2.1 General |
NOTE 2 |
| 4.4.7 Design verification |
NOTE 10 |
ISO9000:20003.8.4 verificationv |
NOTE2 |
| 4.4.8 Design validation |
NOTE 13 hmay be necessary in earlier stages prior to product
completionh |
7.3.6 Design and development validation |
g Where applicable, validation shall be completed prior to
the delivery ---g (The body sentence) |
| 4.9 Process control |
NOTE 2 |
ISO9000: 2000[3.4.1 Process] |
NOTE 3 |